The Civil Engineers’ Unfinished Business: Japan’s Commitment to the Development of the Cambodian Prek Thnot Project

広島平和科学 41 巻 51-71 頁 2020-03 発行
アクセス数 : 508
ダウンロード数 : 155

今月のアクセス数 : 0
今月のダウンロード数 : 1
ファイル情報(添付)
hps_41_51.pdf 21 MB 種類 : 全文
タイトル ( eng )
The Civil Engineers’ Unfinished Business: Japan’s Commitment to the Development of the Cambodian Prek Thnot Project
作成者
Fujimoto Tokihiko
収録物名
広島平和科学
Hiroshima Peace Science
41
開始ページ 51
終了ページ 71
収録物識別子
[PISSN] 0386-3565
[EISSN] 2434-9135
[NCID] AN00213938
抄録
Between the 1950s and 1960s, a comprehensive development plan existed concerning the Lower Mekong River Basin. Questions revolved around who devised what concept for the development of the Lower Mekong River, and how these concepts were implemented. In this article, we first analyzed the processes leading to Japan’s participation in the comprehensive development plan. Next, as part of the tributary development plan for this initiative, we analyzed the processes of the formation and subsequent development of the catchment area’s development plan for the Kingdom of Cambodia’s Prek Thnot River by multilateral development assistance as led by Japan. The development of the Prek Thnot River Power and Irrigation Project stopped as a result of the 1970 Cambodian Civil War and remains incomplete. Therefore, we analyzed the planning potential of the Prek Thnot River’s development plan from current viewpoints. What is made clear from the analyses is that both the basic philosophy and design philosophy behind the Mekong River Basin’s development initiative is relevant to today, and the development should not be conducted as a domestic matter, but should be conducted in continuation of its conceptual framework of international significance, as it concerns the suburb countries of the Mekong River.
言語
英語
資源タイプ 紀要論文
出版者
広島大学平和センター
発行日 2020-03
権利情報
Copyright (c) 2020 広島大学平和センター
出版タイプ Version of Record(出版社版。早期公開を含む)
アクセス権 オープンアクセス
収録物識別子
[ISSN] 0386-3565
[ISSN] 2434-9135
[NCID] AN00213938